2646-v9 |
QAM Chapter 12030 - Fermilab Quality Tool Suite Procedures and Risk Assignment FINAL |
Mary Curtis |
Quality Assurance
QAM (Quality Assurance Manual)
Quality Assurance Subcommittee
|
12 Jan 2021 |
2689-v12 |
QAM 12080 - Fermilab Assessment Program - FINAL |
Mary Curtis |
QAM (Quality Assurance Manual)
Quality Assurance Subcommittee
|
12 Jan 2021 |
2564-v5 |
QAM Chapter 12020 - Suspect/Counterfeit Items (S/CI) Program FINAL |
Jemila Adetunji et al. |
Quality Assurance
QAM (Quality Assurance Manual)
Quality Assurance Subcommittee
|
11 Jan 2021 |
525-v18 |
FESHM 2060: Work Planning and Hazard Analysis FINAL |
Eric Schlatter |
FESHM
Fermilab ES&H Committee
|
05 Jan 2021 |
392-v13 |
FESHM Chapter 4150 - Respiratory Protection FINAL |
Matt Spaw |
FESHM
Industrial Hygiene
Industrial Hygiene Subcommittee
|
21 Dec 2020 |
419-v8 |
FESHM Chapter 8010 - Environmental Protection Program FINAL |
Eric Mieland |
FESHM
Environmental Protection Subcommittee
|
17 Dec 2020 |
373-v11 |
FESHM Chapter 5034 - Pressure Vessel Testing FINAL |
Michael White |
FESHM
Mechanical Safety Subcommittee
|
10 Dec 2020 |
451-v8 |
FRCM Chapter 9 - Special Circumstances - FINAL |
Wayne Schmitt |
Radiation Safety Subcommittee
FRCM
|
07 Dec 2020 |
541-v7 |
FESHM Chapter 9140 - Protection Against Exposed Electrical Bus (Work Smart Standard) FINAL |
David Mertz |
FESHM
Electrical Safety Subcommittee
|
07 Dec 2020 |
379-v8 |
FESHM Chapter 9160 - Low Voltage, High Current Power Distribution Systems (Work Smarts Standard) FINAL |
David Mertz |
FESHM
Electrical Safety Subcommittee
|
07 Dec 2020 |
345-v11 |
FESHM 1060 - Fermilab ES&H Concerns Program FINAL |
Angela Aparicio |
FESHM
Fermilab ES&H Committee
|
07 Dec 2020 |
2514-v4 |
DRAFT - QAM Chapter 12020 - Suspect/Counterfeit Items (S/CI) Program |
Jemila Adetunji et al. |
Quality Assurance
QAM (Quality Assurance Manual)
Quality Assurance Subcommittee
Suspect/Counterfeit Items
|
25 Nov 2020 |
544-v4 |
FESHM Chapter 8020 - General Program Statement on Waste Management FINAL |
Dave Hockin |
FESHM
|
11 Nov 2014 |
532-v6 |
FESHM Chapter 4210 - Environmental Biological Hazards at Fermilab FINAL |
Matt Spaw |
FESHM
Industrial Hygiene Subcommittee
|
13 Nov 2020 |
357-v10 |
FESHM 10110 - Below-The-Hook Lifting Devices FINAL |
Michael White |
FESHM
Mechanical Safety Subcommittee
|
06 Nov 2020 |
4112-v4 |
FESHM 5100 - Structural Safety FINAL |
Michael White |
Mechanical Safety Subcommittee
|
05 Nov 2020 |
1209-v13 |
FESHM 2060 Form: Hazard Analysis |
Kathy Vuletich |
FESHM
Fermilab ES&H Committee
Forms
|
29 Oct 2020 |
871-v7 |
Electrical Safety Subcommittee Determinations |
David Mertz et al. |
Worker Safety Technical Notes
Electrical Safety
Electrical Safety Subcommittee
|
27 Oct 2020 |
358-v16 |
FESHM 10120 - Powered Industrial Trucks (PIT's) FINAL |
Angela Aparicio |
FESHM
Mechanical Safety Subcommittee
|
23 Oct 2020 |
1019-v5 |
DRAFT - FRCM Chapter 4 - Radioactive Materials Art. 411 |
Kathy Graden |
Drafts (FRCM)
Radiation Safety Subcommittee
|
15 Oct 2020 |
445-v15 |
FRCM Chapter 3 - Conduct of Radiological Work - FINAL |
Matt Quinn |
Radiation Safety Subcommittee
FRCM
|
15 Oct 2020 |
356-v16 |
FESHM Chapter 10100 - Overhead Cranes and Hoists FINAL |
Angela Aparicio |
FESHM
Mechanical Safety Subcommittee
|
02 Oct 2020 |
599-v7 |
DRAFT - FESHM Chapter 10120 - Powered Industrial Trucks (PIT's) |
Angela Aparicio |
Drafts
Mechanical Safety Subcommittee
|
17 Sep 2020 |
531-v7 |
FESHM Chapter 4270 - Static Magnetic Fields FINAL |
Matt Spaw |
FESHM
Radiation Safety Subcommittee
|
21 Aug 2020 |
375-v15 |
FESHM 9100 - Fermilab Electrical Safety Program (Work Smarts Standard) FINAL |
David Mertz |
FESHM
Electrical Safety
Electrical Safety Subcommittee
|
29 Jul 2020 |
527-v7 |
FESHM Chapter 5031.3: Gas Regulators for Compressed Gas Cylinders FINAL |
Dave Pushka |
FESHM
Mechanical Safety Subcommittee
|
29 Jul 2020 |
2469-v12 |
QAM 12002 - Fermilab Quality Assurance Program FINAL |
Jemila Adetunji et al. |
Quality Assurance
QAM (Quality Assurance Manual)
Quality Assurance Subcommittee
|
29 Jul 2020 |
459-v20 |
FESHM 3020 - Incident Investigation and Analysis FINAL |
Bridget Iverson |
Safety
FESHM
Fermilab ES&H Committee
Incident Prevention Subcommittee
Industrial Safety
|
26 Jun 2020 |
268-v10 |
Electrical Safety in the Workplace (NFPA 70E) [FN000385/CR/01] |
John Anderson et al. |
Electrical Safety
Electrical Safety Subcommittee
TRAIN
Lesson Plans
|
22 Jun 2020 |
388-v7 |
FESHM Chapter 4250 - Temperature Extremes FINAL |
Jonny Staffa |
FESHM
Industrial Hygiene Subcommittee
|
17 Jun 2020 |
371-v14 |
FESHM Chapters 5033 - Vacuum Vessel Safety FINAL |
Michael White |
Cryogenic Safety Subcommittee
FESHM
|
03 Jun 2020 |
395-v8 |
FESHM Chapter 4290 - Occupational Medicine FINAL |
Kelly Dombrowski |
FESHM
Fermilab ES&H Committee
|
02 Jun 2020 |
2687-v4 |
QAM Chapter 12050 - Root Cause Analysis FINAL |
Jemila Adetunji et al. |
QAM (Quality Assurance Manual)
Quality Assurance Subcommittee
|
04 May 2020 |
3067-v7 |
FESHM Chapter 5031.7 - Membrane Cryostats FINAL |
Michael Geynisman |
Cryogenic Safety Subcommittee
FESHM
|
01 May 2020 |
354-v14 |
FESHM Chapter 4100 - Industrial Hygiene Program FINAL |
Rob Bushek |
FESHM
Industrial Hygiene Subcommittee
|
29 Apr 2020 |
536-v11 |
FESHM Chapter 8021 - Chemical and Radioactive Waste Management FINAL |
Dave Hockin et al. |
FESHM
Environmental Protection Subcommittee
|
16 Apr 2020 |
403-v7 |
FESHM Chapter 6011 - Periodic Testing of Emergency and Exit Lights FINAL |
James Niehoff |
FESHM
Fire Hazard Subcommittee
|
31 Mar 2020 |
404-v8 |
FESHM Chapter 6012 - Periodic Inspection of Fire Doors FINAL |
James Niehoff |
FESHM
Fire Hazard Subcommittee
|
31 Mar 2020 |
453-v9 |
FRCM Chapter 11 - Environmental Radiation Monitoring and Control - FINAL |
Matt Quinn |
Radiation Safety Subcommittee
FRCM
|
21 Feb 2020 |
450-v14 |
FRCM Chapter 8 - ALARA Management of Accelerator Radiation Shielding - FINAL |
Wayne Schmitt |
Radiation Safety Subcommittee
FRCM
|
21 Feb 2020 |
3010-v5 |
FESHM Chapter 8026 - Surface Water Protection FINAL |
Eric Mieland |
FESHM
Environmental Protection Subcommittee
|
21 Feb 2020 |
457-v11 |
FESHM Chapter 8025 - Wastewater Discharge to Sanitary Sewers FINAL |
Eric Mieland |
FESHM
Environmental Protection Subcommittee
|
21 Feb 2020 |
347-v9 |
FESHM Chapter 1080 - Environments, Safety, and Health (ES&H) Requirements for Experiments FINAL |
Eric McHugh |
FESHM
Fermilab ES&H Committee
|
21 Feb 2020 |
2781-v8 |
Electrical Design Standards for Electronics to be used in Experimental Apparatus at Fermilab |
David Mertz et al. |
Electrical Safety
Fire Safety Technical Notes
Electrical Safety Subcommittee
|
13 Feb 2020 |
376-v16 |
FESHM 9120 - AC Electrical Power Distribution Safety (Work Smarts Standard) FINAL |
David Mertz |
FESHM
Electrical Safety Subcommittee
|
16 Jan 2020 |
5325-v1 |
Cryogenic Safety Subcommittee Meeting Minutes FY2020 |
Amber Kenney |
Cryogenic Safety Subcommittee
|
16 Jan 2020 |
528-v14 |
FESHM Chapter 5032: Cryogenic System Review (Work Smart Standard) FINAL |
William M. Soyars |
Cryogenic Safety Subcommittee
FESHM
|
06 Jan 2020 |
3159-v2 |
FESHM Chapter 7070 - Ladder & Scaffold Safety FINAL |
Angela Aparicio |
FESHM
Subcontractor Safety Subcommittee
|
03 Jan 2020 |
332-v20 |
FESHM Chapter 1010 - Laboratory Environment, Safety, and Health Management System and Its Implementation FINAL |
Kathy Vuletich |
FESHM
Fermilab ES&H Committee
|
03 Jan 2020 |
3186-v1 |
Space Heater Recall and Space Heater Safety |
The Other |
Alerts/Recalls
Electrical Safety
Electrical Safety Subcommittee
Lessons Learned
|
03 Jan 2020 |
398-v24 |
FESHM Chaper 6010 -Fire Protection Program FINAL |
James Niehoff |
FESHM
Fire Hazard Subcommittee
|
27 Dec 2019 |
5352-v1 |
Fire Protection - Flammable Refrigerants |
James Niehoff |
Fire Hazard Subcommittee
Fire Department
|
15 Nov 2019 |
431-v10 |
FESHM 8081 - Refrigeration Management FINAL |
Teri Dykhuis |
FESHM
Environmental Protection Subcommittee
|
08 Nov 2019 |
4259-v5 |
FESHM 6020.5 Flammable and Combustible Liquids FINAL |
James Niehoff |
FESHM
Fire Hazard Subcommittee
|
22 Oct 2019 |
3563-v6 |
FESHM 4195 - Special Toxic Hazards - Respirable Crystalline Silica FINAL |
Jonny Staffa |
FESHM
Industrial Hygiene
Industrial Hygiene Subcommittee
|
02 Oct 2019 |
530-v9 |
FESHM Chapter 4190 -Special Toxic Hazards - Beryllium and Beryllium Alloys, Chronic Beryllium Disease Prevention Program FINAL |
Matt Spaw |
FESHM
Industrial Hygiene
Industrial Hygiene Subcommittee
|
02 Oct 2019 |
4118-v3 |
FESHM chapter 4310 - Nanomaterials FINAL |
Matt Spaw |
FESHM
Industrial Hygiene Subcommittee
|
02 Oct 2019 |
4256-v2 |
DRAFT - FESHM 6020.5 Flammable and Combustible Liquids |
James Niehoff |
Fire Hazard Subcommittee
Drafts
|
20 Sep 2019 |
2496-v5 |
QAM 12010 - Lessons Learned Program and Procedures FINAL |
David Baird |
Quality Assurance
QAM (Quality Assurance Manual)
Quality Assurance Subcommittee
|
03 Sep 2019 |
362-v17 |
FESHM 5031.1 - Piping Systems (Work Smarts Standard) FINAL |
Michael Geynisman et al. |
FESHM
Mechanical Safety Subcommittee
|
16 Aug 2019 |
386-v18 |
FESHM 4230 - Confined Spaces FINAL |
Rich Ruthe |
FESHM
Industrial Hygiene Subcommittee
|
01 Aug 2019 |
1097-v8 |
FESHM 5031.6 - Dressed Niobium SRF Cavity Pressure Safety - FINAL |
William M. Soyars |
Cryogenic Safety Subcommittee
FESHM
|
20 Jun 2019 |
1347-v15 |
O.D.H Training FN000029/CR |
Nicole Gee |
Cryogenic Safety Subcommittee
TRAIN
Reference Material
Industrial Safety
|
19 Jun 2019 |
350-v9 |
FESHM 2040 - Emergency Management Program FINAL |
David Esterquest |
Emergency Management Subcommittee
FESHM
|
17 Jun 2019 |
2815-v4 |
FESHM 9190 - Grounding Requirements for Electrical Distribution and Utilization Equipment FINAL |
David Mertz |
FESHM
Electrical Safety Subcommittee
|
03 Jun 2019 |
380-v12 |
FESHM 9180 - Hazard Mitigation for Electrical Workers (Work Smart Standard) FINAL |
David Mertz |
FESHM
Electrical Safety Subcommittee
|
03 Jun 2019 |
522-v7 |
FESHM 9170 - Uninterruptible Alternating Current Power Back-Up Systems FINAL |
David Mertz |
FESHM
Electrical Safety Subcommittee
|
03 Jun 2019 |
521-v10 |
FESHM 9110 - Electrical Utilization Equipment Safety (Work Smart Standard) FINAL |
David Mertz |
FESHM
Electrical Safety Subcommittee
|
03 Jun 2019 |
364-v10 |
FESHM Chapter 5031.4 - Inspection and Testing of Relief Systems FINAL |
Abhishek Deshpande |
FESHM
Mechanical Safety Subcommittee
|
21 May 2019 |
786-v25 |
Emergency Preparedness Drill Critique Forms |
David Esterquest |
Local Drill Information
Senior Safety Officer Subcommittee
|
03 May 2019 |
435-v6 |
FESHM 11001 - Radiation Safety Program FINAL |
Don Cossairt |
FESHM
Radiation Safety Subcommittee
FRCM
|
26 Apr 2019 |
385-v11 |
FESHM 4260 - Lasers FINAL |
Matt Quinn |
FESHM
Radiation Safety Subcommittee
|
17 Jan 2019 |
429-v7 |
FESHM 8060 - National Environmental Policy Act Review Policy FINAL |
Teri Dykhuis |
FESHM
Environmental Protection Subcommittee
|
16 Jan 2019 |
1349-v1 |
Site Wide Routine Maintenance NEPA-CX Approval June CY2002 |
Teri Dykhuis |
Environmental Protection Subcommittee
NEPA
|
15 Jan 2019 |
1270-v3 |
FESHM 8050 Form: Application for Modification or Addition to Fermilab Water Supply Systems |
Katie Swanson |
FESHM
Forms
Environmental Protection Subcommittee
|
10 Jan 2019 |
428-v11 |
FESHM 8050 - Domestic Water Protection FINAL |
Katie Swanson |
FESHM
Environmental Protection Subcommittee
|
10 Jan 2019 |
432-v20 |
FESHM 10160 - Traffic Safety FINAL |
Chuck Morrison et al. |
Emergency Management Subcommittee
FESHM
|
09 Jan 2019 |
415-v16 |
FESHM 7010 - Construction ES&H Program FINAL |
James Niehoff |
FESHM
Subcontractor Safety Subcommittee
Construction
|
02 Jan 2019 |
556-v9 |
DRAFT - FESHM Chapter 4260 - Lasers |
Matt Quinn |
FESHM
Laser Safety Subcommittee
Drafts
|
10 Dec 2018 |
427-v9 |
FESHM 8043 - Toxic Release Inventory (TRI) Reporting Program FINAL |
Dave Hockin et al. |
FESHM
Environmental Protection Subcommittee
|
06 Dec 2018 |
1227-v6 |
FESHM Chapter 10120 Form: Fermilab Forklift Operator Evaluation |
Marcel Borcean |
FESHM
Mechanical Safety Subcommittee
Forms
|
04 Dec 2018 |
1225-v3 |
FESHM Chapter 10120 Form: Operator's Daily Checklist By Week |
Marcel Borcean |
FESHM
Mechanical Safety Subcommittee
Forms
|
04 Dec 2018 |
1226-v3 |
FESHM Chapter 10120 Form: Powered Industrial Truck Attachment |
Marcel Borcean |
FESHM
Mechanical Safety Subcommittee
Forms
|
04 Dec 2018 |
4356-v4 |
FESHM 10190 Form - Planning and Authorization form |
Angela Aparicio et al. |
FESHM
Mechanical Safety Subcommittee
Forms
|
04 Dec 2018 |
1253-v5 |
FESHM Chapter 2100 Form: Fermilab General Loto Procedure |
David Mertz |
FESHM
Electrical Safety Subcommittee
Forms
|
30 Nov 2018 |
393-v12 |
FESHM Chapter 2100 - Fermilab Energy Control Program (Lockout/Tagout) FINAL |
David Mertz |
FESHM
Electrical Safety Subcommittee
|
30 Nov 2018 |
1471-v4 |
FESHM Chapter 3020 Form: Incident Investigation and Analysis |
David Baird |
FESHM
Incident Prevention Subcommittee
Forms
|
20 Nov 2018 |
2425-v2 |
Switch and Circuit Breaker Operation [PD000301/CR/01] |
Angela Aparicio et al. |
Particle Physics Division
Industrial Safety
Electrical Safety Subcommittee
Safety & IH
|
14 Nov 2018 |
3176-v3 |
10 CFR 851 Overview for Subcontractors |
James Niehoff |
Subcontractor Safety Subcommittee
ESH Tools
|
24 Sep 2018 |
4323-v2 |
FESHM 7090 - Tech Shop Safety FINAL |
Eric McHugh et al. |
FESHM
Mechanical Safety Subcommittee
|
21 Sep 2018 |
4404-v4 |
FESHM 10190 form - Proof Test and Pre-lift Inspection form |
Angela Aparicio et al. |
FESHM
Mechanical Safety Subcommittee
Forms
|
20 Sep 2018 |
629-v5 |
DRAFT - FESHM Chapter 3020 - Incident Investigation and Analysis |
David Baird |
Drafts
Incident Prevention Subcommittee
|
14 Sep 2018 |
367-v7 |
FESHM 5032.1 - Liquid Nitrogen Dewar Installation and Operation Rules (Work Smarts Standard) FINAL |
William M. Soyars |
Cryogenic Safety Subcommittee
FESHM
|
12 Sep 2018 |
604-v9 |
DRAFT - FESHM 5032.1 - Liquid Nitrogen and Liquid Argon Dewar Installation and Operation Rules (Work Smarts Standard) |
William M. Soyars |
Cryogenic Safety Subcommittee
Drafts
|
17 Aug 2018 |
2639-v4 |
QAM Chapter 12060 - Quality Assurance Guidelines for Scientific Research FINAL |
Jemila Adetunji et al. |
Quality Assurance
QAM (Quality Assurance Manual)
Quality Assurance Subcommittee
|
15 Aug 2018 |
3311-v5 |
FESHM Chapter 2005 - Operational Readiness Clearance - FINAL |
Eric McHugh |
FESHM
Fermilab ES&H Committee
|
27 Jul 2018 |
425-v7 |
FESHM Chapter 8041 - Polychlorinated Biphenyls FINAL |
Amy L. Pavnica |
FESHM
Environmental Protection Subcommittee
|
23 Jul 2018 |
422-v7 |
FESHM Chapter 8023 - General Refuse FINAL |
Amy L. Pavnica |
FESHM
Environmental Protection Subcommittee
|
23 Jul 2018 |
446-v9 |
FRCM Chapter 4 - Radioactive Materials - FINAL |
Don Cossairt |
Radiation Safety Subcommittee
FRCM
Posted (FRCM)
|
18 Jul 2018 |
387-v18 |
FESHM Chapter 4240 - Oxygen Deficiency Hazards (ODH) (Work Smarts Standard) FINAL |
William M. Soyars |
Cryogenic Safety Subcommittee
FESHM
|
18 Jul 2018 |
2692-v3 |
FESHM Chapter 12001 - Quality Assurance Manual FINAL |
TJ Sarlina |
FESHM
QAM (Quality Assurance Manual)
Quality Assurance Subcommittee
|
16 Jul 2018 |
3279-v10 |
All Forms Associated with FESHM Chapter 7010 |
James Niehoff |
FESHM
Subcontractor Evaluations
Subcontractor
Subcontractor Safety Subcommittee
|
06 Jul 2018 |
4353-v1 |
FESHM 10190 - Crane Personnel Lifting Platforms - FINAL |
Angela Aparicio et al. |
FESHM
Mechanical Safety Subcommittee
|
22 Jun 2018 |
4320-v1 |
FESHM 7005 - Facility Construction, Modification, and Inspection FINAL |
James Niehoff |
FESHM
Subcontractor Safety Subcommittee
Construction
|
22 Jun 2018 |
624-v4 |
DRAFT - FESHM Chapter 4150 - Respiratory Protection |
Jonny Staffa |
Drafts
Industrial Hygiene Subcommittee
|
21 Jun 2018 |
4410-v1 |
FESHM 7005 Authorization for Use and Possession Form |
James Niehoff |
FESHM
Subcontractor Safety Subcommittee
Forms
Construction
|
20 Jun 2018 |
4416-v1 |
FESHM 7005 Final Acceptance Form |
James Niehoff |
FESHM
Subcontractor Safety Subcommittee
Forms
Construction
|
20 Jun 2018 |
4413-v1 |
FESHM 7005 AUP Punch List Form |
James Niehoff |
FESHM
Subcontractor Safety Subcommittee
Forms
Construction
|
20 Jun 2018 |
4350-v1 |
FESHM 10190 - Crane Personnel Lifting Platforms - DRAFT |
Angela Aparicio et al. |
Drafts
Mechanical Safety Subcommittee
|
20 Jun 2018 |
620-v8 |
DRAFT - FESHM Chapter 4240 - Oxygen Deficiency Hazards (ODH) (Work Smarts Standard) |
William M. Soyars |
Cryogenic Safety Subcommittee
Drafts
|
19 Jun 2018 |
4395-v1 |
Tech Shop Operator Eval Form - Basic |
Jon Ylinen |
FESHM
Mechanical Safety Subcommittee
Forms
|
18 Jun 2018 |
4398-v1 |
Tech Shop Evaluation Form - Mills & Lathes |
Jon Ylinen |
FESHM
Mechanical Safety Subcommittee
Forms
|
18 Jun 2018 |
360-v8 |
FESHM Chapter 10130 - Slings and Rigging Hardware FINAL |
Marcel Borcean |
FESHM
Mechanical Safety Subcommittee
|
10 Jun 2018 |
408-v11 |
FESHM Chapter 6020.2 - Welding, Burning, Brazing and Spark Producing Operations FINAL |
Charles E. Kuhn et al. |
FESHM
Fire Hazard Subcommittee
|
01 Jun 2018 |
4311-v1 |
Draft FESHM 7005 - Facility Construction, Modification, and Inspection |
James Niehoff |
Drafts
Subcontractor Safety Subcommittee
Construction
|
29 May 2018 |
410-v5 |
FESHM 6020.4 - Concepts of Egress FINAL |
James Niehoff et al. |
FESHM
Fire Hazard Subcommittee
|
25 May 2018 |
2427-v5 |
FESHM 6016 - Hazard Map Program (Pre-Incident Planning) FINAL |
James Niehoff et al. |
FESHM
Fire Hazard Subcommittee
|
25 May 2018 |
1220-v5 |
FESHM 10130 Form: Wire Rope Chain Sling Inspection |
Marcel Borcean |
FESHM
Mechanical Safety Subcommittee
|
21 May 2018 |
1218-v4 |
FESHM 10130 Form: Web Sling Inspection |
Marcel Borcean |
FESHM
Mechanical Safety Subcommittee
|
21 May 2018 |
413-v6 |
FESHM Chapter 6040.2 - Fire Construction Requirements - Interior Finish Materials FINAL |
James Niehoff et al. |
FESHM
Fire Hazard Subcommittee
|
08 May 2018 |
406-v9 |
FESHM Chapter 6015 - Highly Protected Risk Inspection Program FINAL |
James Niehoff et al. |
FESHM
Fire Hazard Subcommittee
|
08 May 2018 |
409-v7 |
FESHM Chapter 6020.3 - Storage and Use of Flammable Gases (Work Smarts Standard) FINAL |
James Niehoff et al. |
FESHM
Fire Hazard Subcommittee
|
02 May 2018 |
2374-v2 |
DRAFT - FESHM Chapter 6016 - Hazard Map Program (Pre-Incident Planning) |
James Niehoff et al. |
Fire Hazard Subcommittee
Drafts
|
19 Apr 2018 |
658-v5 |
DRAFT - FESHM Chapter 6015 - Highly Protected Risk Inspection Program |
James Niehoff et al. |
FESHM
Fire Hazard Subcommittee
|
19 Apr 2018 |
885-v4 |
Basic Electrical Safety [FN000235/CR/00] |
David Mertz |
Electrical Safety
Electrical Safety Subcommittee
TRAIN
Reference Material
|
13 Apr 2018 |
1229-v10 |
FESHM Chapter 5031.1 Form: Piping Engineering Note |
Michael White |
FESHM
Mechanical Safety Subcommittee
|
11 Apr 2018 |
420-v7 |
FESHM Chapter 8012 - Sedimentation and Erosion Control Planning FINAL |
Katie Swanson |
FESHM
Environmental Protection Subcommittee
|
26 Mar 2018 |
1470-v2 |
FESHM Chapter 5031.6 Form: Dressed SRF Cavity Engineering |
William M. Soyars |
Cryogenic Safety Subcommittee
FESHM
|
16 Mar 2018 |
4046-v2 |
Draft - FESHM 5100 - Structural Safety |
Brian Rubik |
Drafts
Mechanical Safety Subcommittee
|
01 Mar 2018 |
423-v7 |
FESHM Chapter 8030 - Chemical Releases - Spill Prevention and Response FINAL |
Amber Kenney |
FESHM
Environmental Protection Subcommittee
|
21 Feb 2018 |
353-v13 |
FESHM Chapter 2070 - ESH Training Program FINAL |
Joel Kofron |
FESHM
Fermilab ES&H Committee
|
05 Feb 2018 |
473-v6 |
FRCM Chapter 12 - Glossary FINAL |
Don Cossairt |
Radiation Safety Subcommittee
FRCM
|
02 Feb 2018 |
444-v15 |
FRCM Chapter 2 - Radiological Standards FINAL |
Don Cossairt |
Radiation Safety Subcommittee
FRCM
|
02 Feb 2018 |
2688-v3 |
QAM Chapter 12070 - Graded Approach Procedure FINAL |
Kathy Vuletich |
QAM (Quality Assurance Manual)
Quality Assurance Subcommittee
|
02 Feb 2018 |
2645-v6 |
QAM Chapter 12040 - Corrective and Preventative Actions FINAL |
Jemila Adetunji et al. |
Quality Assurance
QAM (Quality Assurance Manual)
Quality Assurance Subcommittee
|
02 Feb 2018 |
389-v7 |
FESHM Chapter 4280 - Ultraviolet Radiation Exposure FINAL |
David Baird |
FESHM
Radiation Safety Subcommittee
|
02 Feb 2018 |
394-v6 |
FESHM Chapter 2090 - Development, Maintenance, Procurement and Usage of Software Products Related to Environment, Safety, and Health FINAL |
Matt Quinn |
FESHM
Fermilab ES&H Committee
|
01 Feb 2018 |
430-v8 |
FESHM Chapter 8070 - Decontamination and Decommissioning Documentation FINAL |
Don Cossairt et al. |
FESHM
Subcontractor Safety Subcommittee
|
01 Feb 2018 |
3156-v1 |
FESHM Chapter 10180 - Aerial Lifts FINAL |
Mike Bonkalski |
FESHM
Subcontractor Safety Subcommittee
|
01 Feb 2018 |
405-v6 |
FESHM Chapter 6014 - Fire Watch FINAL |
Jim Priest |
FESHM
Fire Hazard Subcommittee
|
01 Feb 2018 |
349-v8 |
FESHM Chapter 2020 - Work Permit and Notification Form FINAL |
James Niehoff |
FESHM
Subcontractor Safety Subcommittee
|
01 Feb 2018 |
351-v8 |
FESHM Chapter 2050 - Building Manager Program FINAL |
James Niehoff |
FESHM
Fermilab ES&H Committee
|
01 Feb 2018 |
378-v5 |
FESHM Chapter 9150 - High Voltage Coaxial Connectors FINAL |
David Mertz |
FESHM
Electrical Safety Subcommittee
|
01 Feb 2018 |
368-v6 |
FESHM Chapter 5032.2 - Liquid Cryogenic Targets (Work Smarts Standard) FINAL |
Arkadiy Klebaner |
Cryogenic Safety Subcommittee
FESHM
|
01 Feb 2018 |
414-v7 |
FESHM Chapter 6040.3 - Protection of Openings in Fire Rated Assemblies FINAL |
James Niehoff et al. |
FESHM
Fire Hazard Subcommittee
|
01 Feb 2018 |
412-v5 |
FESHM Chapter 6040.1 - Fire Construction Requirements - Fire Retardant Coatings for Combustible Construction Materials FINAL |
Jim Priest |
FESHM
Fire Hazard Subcommittee
|
01 Feb 2018 |
1592-v4 |
FESHM Chapter 1100 - Sustainable Acquisition FINAL |
Teri Dykhuis |
FESHM
Environmental Protection Subcommittee
|
01 Feb 2018 |
2275-v5 |
FESHM Chapter 2001 - Environment, Safety & Health for Projects FINAL |
Don Cossairt |
FESHM
Fermilab ES&H Committee
|
01 Feb 2018 |
421-v6 |
FESHM Chapter 8022 - Recycling, Waste Minimization and Pollution Prevention FINAL |
Katie Swanson |
FESHM
Environmental Protection Subcommittee
|
01 Feb 2018 |
1080-v4 |
FESHM Chapter 8031 - Oil Pollution Prevention FINAL |
Eric Korzeniowski |
FESHM
Environmental Protection Subcommittee
|
01 Feb 2018 |
2039-v4 |
FESHM Chapter 4160 - Emergency Eyewash and Shower Stations FINAL |
Tom Gibbs |
FESHM
Industrial Hygiene Subcommittee
|
01 Feb 2018 |
3353-v1 |
FESHM Chapter 7080 - Concrete Anchor Devices FINAL |
Christine Ader |
FESHM
Subcontractor Safety Subcommittee
|
01 Feb 2018 |
366-v6 |
FESHM Chapter 5031.5 - Low Pressure Vessels and Fluid Containment FINAL |
Michael Geynisman et al. |
FESHM
Mechanical Safety Subcommittee
|
01 Feb 2018 |
456-v10 |
FESHM Chapter 5031 - Pressure Vessels (Work Smart Standard) FINAL |
Roger Rabehl |
FESHM
Mechanical Safety Subcommittee
|
01 Feb 2018 |
443-v12 |
FRCM Chapter 1 - Fermilab Radiological Control Program FINAL |
Don Cossairt |
Radiation Safety Subcommittee
FRCM
|
01 Feb 2018 |
3194-v1 |
QAM Chapter 12090 - Software Quality Assurance Grading & Inventory Procedure FINAL |
Kathy Vuletich |
Quality Assurance
QAM (Quality Assurance Manual)
Quality Assurance Subcommittee
|
31 Jan 2018 |
449-v6 |
FRCM Chapter 7 - Radiological Records FINAL |
Don Cossairt |
Radiation Safety Subcommittee
Posted (FRCM)
|
31 Jan 2018 |
452-v5 |
FRCM Chapter 10 - Radiation Safety Interlock Systems - FINAL |
Don Cossairt |
Radiation Safety Subcommittee
FRCM
|
31 Jan 2018 |
348-v17 |
FESHM Chapter 2010 - Planning and Review of Accelerator Facilities and Their Operations (Work Smarts Standard) FINAL |
Don Cossairt |
Work Smart Set
FESHM
Fermilab ES&H Committee
|
31 Jan 2018 |
3253-v2 |
FESHM Chapter 2110 - Ensuring Equivalent Safety Performance When Using International Codes and Standards FINAL |
Martha Michels |
FESHM
Fermilab ES&H Committee
|
31 Jan 2018 |
418-v4 |
FESHM 7050 - Rules for Demolition FINAL |
James Niehoff |
FESHM
Decontamination and Decommissioning
Subcontractor Safety Subcommittee
|
31 Jan 2018 |
384-v9 |
FESHM Chapter 4140 - Hearing Conservation FINAL |
Jonny Staffa |
FESHM
Industrial Hygiene Subcommittee
|
31 Jan 2018 |
346-v15 |
FESHM Chapter 1070 - Fermilab Work Smart Set FINAL |
Martha Michels |
FESHM
Fermilab ES&H Committee
|
31 Jan 2018 |
344-v8 |
FESHM Chapter 1051 - Control of Environment, Safety, & Health Documents FINAL |
Martha Michels |
FESHM
Fermilab ES&H Committee
|
31 Jan 2018 |
526-v11 |
FESHM Chapter 3010: Significant and Reportable Occurrences (Work Smart Standard) FINAL |
Angela Aparicio |
FESHM
Fermilab ES&H Committee
|
31 Jan 2018 |
448-v13 |
FRCM Chapter 6 - Radiological Training and Qualification - FINAL |
Don Cossairt |
Radiation Safety Subcommittee
FRCM
|
31 Jan 2018 |
447-v9 |
FRCM Chapter 5 - Radiological Health Support Operations - FINAL |
Don Cossairt |
Radiation Safety Subcommittee
FRCM
|
31 Jan 2018 |
381-v8 |
FESHM Chapter 4110 - Hazard Communication FINAL |
Rob Bushek |
FESHM
Industrial Hygiene Subcommittee
|
31 Jan 2018 |
390-v7 |
FESHM Chapter 4220 - Bloodborne Pathogens FINAL |
Kelly Dombrowski |
FESHM
Fermilab ES&H Committee
|
31 Jan 2018 |
535-v5 |
FESHM Chapter 6013 - Facility Incident Reporting Utility System (FIRUS) FINAL |
Jim Priest |
FESHM
Fire Hazard Subcommittee
|
31 Jan 2018 |
407-v9 |
FESHM Chapter 6020.1 - Placement of Portable Fire Extinguishers in Primary Beam Enclosures FINAL |
Jim Priest |
FESHM
Fire Hazard Subcommittee
|
31 Jan 2018 |
411-v9 |
FESHM Chapter 6030 - Disablement of Fire Protection Systems and Other Related Safety Systems FINAL |
Jim Priest |
FESHM
Fire Hazard Subcommittee
|
31 Jan 2018 |
3193-v1 |
QAM Chapter 12003 - Fermilab Software Quality Assurance Program FINAL |
William Boroski |
Quality Assurance
QAM (Quality Assurance Manual)
Quality Assurance Subcommittee
|
31 Jan 2018 |
369-v10 |
FESHM Chapter 5032.3- Transporting Gases in Building Elevators (Work Smarts Standard) FINAL |
Michael Geynisman |
Cryogenic Safety Subcommittee
FESHM
|
31 Jan 2018 |
377-v7 |
FESHM Chapter 9130 - Management and Use of Cable Tray Systems (Work Smarts Standard) FINAL |
David Mertz et al. |
FESHM
Electrical Safety Subcommittee
|
31 Jan 2018 |
539-v4 |
FESHM Chapter 8011 - Groundwater Protection - Excavations and Wells FINAL |
Chris Greer |
FESHM
Environmental Protection Subcommittee
|
31 Jan 2018 |
538-v5 |
FESHM Chapter 7040 - Concrete Cutting and Coring Activities FINAL |
James Niehoff |
FESHM
Subcontractor Safety Subcommittee
|
31 Jan 2018 |
436-v8 |
FESHM Chapter 1110 - ES&H Policy for Building Safety Requirements and Controls at Fermilab FINAL |
Lori Limberg |
FESHM
Fermilab ES&H Committee
|
31 Jan 2018 |
524-v8 |
FESHM Chapter 1011: Environment, Safety and Health Expectations when Working at Laboratories other than Fermilab FINAL |
Amber Kenney |
FESHM
Fermilab ES&H Committee
|
31 Jan 2018 |
529-v6 |
FESHM Chapter 4200: Special Toxic Hazards - Lead-Containing Materials FINAL |
Jonny Staffa |
FESHM
Industrial Hygiene Subcommittee
|
31 Jan 2018 |
533-v4 |
FESHM Chapter 4170 - Hazard Control Ventilation FINAL |
Jonny Staffa |
FESHM
Industrial Hygiene Subcommittee
|
31 Jan 2018 |
343-v8 |
FESHM Chapter 1050- Environment, Safety and Health Manual Procedures FINAL |
James Niehoff |
FESHM
Fermilab ES&H Committee
|
31 Jan 2018 |
537-v7 |
FESHM Chapter 7020 - ES&H Program for Subcontractor Safety Other Than Construction FINAL |
Kent Collins |
FESHM
Subcontractor Safety Subcommittee
|
31 Jan 2018 |
546-v12 |
FESHM Chapter 4120 - Ergonomics Program (Work Smart Standard) FINAL |
Rob Bushek |
FESHM
Incident Prevention Subcommittee
|
31 Jan 2018 |
363-v7 |
FESHM Chapter 5031.2 - Inert Gas Trailer Connections and Onsite Filling FINAL |
Dave Pushka |
FESHM
Mechanical Safety Subcommittee
|
31 Jan 2018 |
417-v12 |
FESHM Chapter 7030 - Excavation FINAL |
James Niehoff |
FESHM
Subcontractor Safety Subcommittee
|
31 Jan 2018 |
382-v9 |
FESHM Chapter 4180 - Asbestos Management Program FINAL |
Tom Gibbs et al. |
FESHM
Industrial Hygiene Subcommittee
|
31 Jan 2018 |
372-v11 |
FESHM Chapter 5033.1 - Vacuum Window Safety (Work Smarts Standard) FINAL |
Christine Ader |
FESHM
Mechanical Safety Subcommittee
|
31 Jan 2018 |
2476-v3 |
HCTT Chemical Clear Out Program |
Dave Hockin et al. |
Waste Management
Environmental Protection Subcommittee
Environmental
|
18 Dec 2017 |
3799-v1 |
Power Cord & Power Strip Safety |
David Mertz |
Electrical Safety
Electrical Safety Subcommittee
|
26 Oct 2017 |
3298-v12 |
Fermilab Quality Assurance Subcommittee Meeting Minutes FY2017 |
Kathy Vuletich |
Fermilab ES&H Committee
|
14 Sep 2017 |
478-v17 |
Traffic Safety Awareness Training Rev. 03212014 |
Lori Limberg |
Traffic Safety Subcommittee
TRAIN
Reference Material
Business Services Section
|
12 May 2017 |
3501-v1 |
FESHM Chapter 5031.5 Form: Technical Appendix Form for Low Pressure Vessels |
Michael Geynisman |
FESHM
Mechanical Safety Subcommittee
|
10 May 2017 |
2359-v61 |
NEPA Reviews, Projects, and Cultural Resources Status Update |
Teri Dykhuis |
Projects
Environmental Protection Subcommittee
NEPA
|
23 Mar 2017 |
778-v8 |
Fermilab Controlled Access [FN000311/CR/01] |
Wayne Schmitt |
TRAIN
Reference Material
Radiation Safety Subcommittee
|
13 Jan 2017 |
3072-v6 |
Pressure Relief Valve Incident at Proton Assembly Building PAB 5/5/2015 |
Terry Tope |
Lessons Learned
Mechanical Safety Subcommittee
Incident Investigation and Analysis
|
15 Jun 2016 |
3188-v1 |
IH:101 Presentation for Subcontractor Safety Subcommittee |
Rob Bushek |
ESH
Industrial Safety
Subcontractor Safety Subcommittee
Industrial Hygiene
|
28 Jan 2016 |
3141-v1 |
Metal Halide Bulb Fails, Shatters Outer Glass Envelope, Hot Glass Shard Chars Wood Crate |
Eric McHugh |
Electrical Safety
Particle Physics Division
Electrical Safety Subcommittee
ES&H
|
02 Oct 2015 |
1000-v2 |
MSA Altair Multi-Gas Detector [FN000452/CR/01] |
Mike Bonkalski |
TRAIN
Reference Material
Industrial Hygiene
Industrial Safety
Industrial Hygiene Subcommittee
Safety & IH
|
25 Sep 2015 |
3106-v1 |
SSO Goal 2015 VMS Visual Media Services Material Handling Assessment |
Tom Gibbs |
Fermilab
Directorate
Senior Safety Officer Subcommittee
|
12 Aug 2015 |
3104-v1 |
1 Meson Hill Well Sealing and Abandonment NEPA-CX Approved July CY2015 |
Michael Weis |
Environmental Protection Subcommittee
NEPA
|
03 Aug 2015 |
3101-v1 |
FHS July CY 15 Report |
Jim Priest |
Fire Protection
Fire Hazard Subcommittee
|
22 Jul 2015 |
3098-v1 |
Site 39 Radioanalytical Technicians Material Handling Assessment iTrack 43046 |
Tom Gibbs |
Senior Safety Officer Subcommittee
|
07 Jul 2015 |
2605-v1 |
1 Nepese Marsh Upgrades NEPA-CX FSO Approval October CY2013 |
Michael Weis |
Facility Engineering Services Section
Environmental Protection Subcommittee
NEPA
|
23 Jun 2015 |
3089-v1 |
1 Main Ring Service Buildings E2 and E3 Demolition NEPA-CX Approved April CY2015 |
Michael Weis |
Procedures
Accelerator Division
Environmental Protection Subcommittee
|
15 Jun 2015 |
3088-v1 |
1 Industrial Complex Buildings Addition NEPA-CX Approved April CY2015 |
Michael Weis |
Environmental Protection Subcommittee
APS-TD
NEPA
|
15 Jun 2015 |
3087-v1 |
1 Demolition of F0 Trailers NEPA-CX Approved May CY2015 |
Michael Weis |
Accelerator Division
Environmental Protection Subcommittee
NEPA
|
15 Jun 2015 |
3068-v1 |
1 Main Ring Service Buildings E2 and E3 Demolition NEPA-CX Approved April CY2015 |
Michael Weis |
Accelerator Division
Environmental Protection Subcommittee
NEPA
|
06 May 2015 |
3070-v1 |
1 Short Baseline Neutrino Program NEPA-CX Approved November CY2014 |
Teri Dykhuis |
Particle Physics Division
Environmental Protection Subcommittee
NEPA
|
06 May 2015 |
3071-v1 |
1 Utilities Upgrade Project NEPA-CX Approved November CY2014 |
Michael Weis |
Facility Engineering Services Section
Environmental Protection Subcommittee
NEPA
|
06 May 2015 |
3069-v1 |
1 Industrial Complex Buildings Addition NEPA-CX Aproved April CY2015 |
Michael Weis |
Environmental Protection Subcommittee
APS-TD
NEPA
|
06 May 2015 |
3034-v1 |
Fermilab Cultural Resources Management Plan 2014 |
Teri Dykhuis |
Cultural Resources
Environmental Protection Subcommittee
|
09 Feb 2015 |
2945-v1 |
1 SRF Cavity Processing NEPA-CX Approved February CY2014 |
Michael Weis |
Environmental Protection Subcommittee
NEPA
|
26 Nov 2014 |
2944-v1 |
1 Niobium Tin Superconducting Coil Development for Future Magnets NEPA-CX Approved April CY2014 |
Michael Weis |
Environmental Protection Subcommittee
NEPA
|
26 Nov 2014 |
2943-v1 |
1 MiniBooNE Berm Repair NEPA-CX Approved March CY2014 |
Michael Weis |
Environmental Protection Subcommittee
NEPA
|
26 Nov 2014 |
2942-v1 |
1 Lab 3 NEPA-CX Approved March CY2014 |
Michael Weis |
Environmental Protection Subcommittee
NEPA
|
26 Nov 2014 |
2941-v1 |
1 Lab 7 NEPA-CX Approved January CY2014 |
Michael Weis |
Environmental Protection Subcommittee
NEPA
|
26 Nov 2014 |
2940-v1 |
1 Drainage Improvements NEPA-CX Approved March CY2014 |
Michael Weis |
Environmental Protection Subcommittee
NEPA
|
26 Nov 2014 |
2939-v1 |
1 CDF Repurpsing NEPA-CX Approved January CY2014 |
Michael Weis |
Environmental Protection Subcommittee
NEPA
|
26 Nov 2014 |
2938-v1 |
1 ATLAS NEPA-CX Approved March CY2014 |
Michael Weis |
Environmental Protection Subcommittee
NEPA
|
26 Nov 2014 |
2937-v1 |
1 2014 Demolition Jobs NEPA-CX June CY2014 |
Michael Weis |
Environmental Protection Subcommittee
NEPA
|
26 Nov 2014 |
2932-v1 |
1 Utility Upgrade Project NEPA-CX Approved November CY2014 |
Teri Dykhuis |
Facility Engineering Services Section
Environmental Protection Subcommittee
NEPA
|
19 Nov 2014 |
2924-v1 |
1 Generic CX for Small Scale R&D Activities and Conventional Lab Ops NEPA-CX November CY2014 |
Michael Weis |
Environmental Protection Subcommittee
NEPA
|
14 Nov 2014 |
2667-v1 |
1 Small Magnet Prototype and Research and Development (RD) NEPA-CX FSO Approval December CY2013 |
Michael Weis |
Environmental Protection Subcommittee
APS-TD
NEPA
|
14 Nov 2014 |
2923-v1 |
1 Short Baseline Neutrino Program NEPA-CX November CY2014 |
Michael Weis |
Environmental Protection Subcommittee
NEPA
|
14 Nov 2014 |
2162-v1 |
Office Ergonomics Exercises |
Rafael Coll |
Instructions
Ergonomics Subcommittee
TRAIN
Ergonomics
|
29 May 2014 |
2577-v1 |
1 Geotechnical Investigation at the Sanford Lab in Lead, South Dakota NEPA-CX FSO Approval October CY2013 |
Michael Weis |
LBNE
Environmental Protection Subcommittee
NEPA
|
16 May 2014 |
2777-v1 |
A Visual Guide to Electrical Safety Supplies at Fermilab Stockroom |
David Mertz |
Electrical Safety
Electrical Safety Subcommittee
|
07 May 2014 |
2743-v1 |
1 Superconducting Radio Frequency Cavity Processing NEPA-CX FSO Approval March CY2014 |
Michael Weis |
Environmental Protection Subcommittee
APS-TD
NEPA
|
26 Mar 2014 |
2742-v1 |
1 Niobium Tin Superconducting Coil Development for Future Magnets NEPA-CX FSO Approval February CY2014 |
Michael Weis |
Environmental Protection Subcommittee
APS-TD
NEPA
|
26 Mar 2014 |
2741-v1 |
1 MiniBooNE Berm Repair NEPA-CX FSO Approval January CY2014 |
Michael Weis |
Facility Engineering Services Section
Environmental Protection Subcommittee
NEPA
|
26 Mar 2014 |
2740-v1 |
1 Fermilab Drainage Improvements NEPA-CX FSO Approval March CY2014 |
Michael Weis |
Facility Engineering Services Section
Environmental Protection Subcommittee
NEPA
|
26 Mar 2014 |
2739-v1 |
1 ATLAS Large Scale Thin Gap Chambers Testing NEPA-CX FSO Approval February CY2014 |
Michael Weis |
Particle Physics Division
Environmental Protection Subcommittee
NEPA
|
26 Mar 2014 |
2717-v1 |
Archaeological and Architectural Assessment of Historic Properties within the Fermi National Accelerator Laboratory, Batavia Township, Kane County and Winfield Township, DuPage County, IL |
Teri Dykhuis |
Environmental Protection Subcommittee
|
26 Feb 2014 |
2713-v1 |
1 Lab 7 NEPA - CX FSO Approval January CY2014 |
Michael Weis |
Particle Physics Division
Environmental Protection Subcommittee
NEPA
|
24 Feb 2014 |
2712-v1 |
1 CDF Repurposing NEPA - CX FSO Approval January CY2014 |
Michael Weis |
Particle Physics Division
Environmental Protection Subcommittee
NEPA
|
24 Feb 2014 |
2709-v1 |
1 Lab 3 NEPA CX-FSO Approval February CY2014 |
Michael Weis |
Particle Physics Division
Environmental Protection Subcommittee
NEPA
|
18 Feb 2014 |
2607-v1 |
1 Lab 8 NEPA-CX FSO Approval October CY2013 |
Michael Weis |
Particle Physics Division
Environmental Protection Subcommittee
NEPA
|
28 Oct 2013 |
2606-v1 |
1 T-1037 FLYSUB Consortium Tracking and RICH Performance Evaluation NEPA-CX FSO Approval October CY2012 |
Michael Weis |
Particle Physics Division
Environmental Protection Subcommittee
NEPA
|
28 Oct 2013 |
2569-v1 |
1 Addendum to Various Demolitions 2013 NEPA-CX October CY2013 |
Michael Weis |
Environmental Protection Subcommittee
NEPA
|
07 Oct 2013 |
2543-v1 |
1 PPD Outback Garage NEPA-CX Approval September CY2013 |
Teri Dykhuis |
Environmental Protection Subcommittee
NEPA
|
23 Sep 2013 |
2532-v2 |
Environmental Protection Subcommittee Presentation: Integration of National Environmental Policy Act (NEPA) and National Historic Preservation Act (NHPA) |
Teri Dykhuis |
Environmental Protection Subcommittee
NEPA
|
03 Sep 2013 |
2517-v1 |
1 LBNE Future Stockpile Site Preparation NEPA-CX Approval August CY2013 |
Michael Weis |
LBNE
Environmental Protection Subcommittee
NEPA
|
21 Aug 2013 |
2474-v1 |
LHC CMS Upgrade CX Approval |
Amber Kenney |
Projects
Environmental Protection Subcommittee
NEPA
|
10 Jul 2013 |
2455-v1 |
Various Demolitions 2013 NEPA-CX Approval June CY2013 |
Amber Kenney |
Environmental Protection Subcommittee
NEPA
|
11 Jun 2013 |
2393-v1 |
Illinois Historic Preservation Agency Approval of Cultural Resources Reports for the Frog and Tadpole Sites |
Michael Weis |
Cultural Resources
LBNE
Environmental Protection Subcommittee
|
18 Mar 2013 |
2376-v1 |
1 NICADD Extrusion Line Facility NEPA-CX Approval February CY2013 |
Michael Weis |
Environmental Protection Subcommittee
NEPA
|
06 Mar 2013 |
2346-v1 |
IHPA Approval of Cultural Reports for 11-DU-524 and 11-DU-219 |
Michael Weis |
Cultural Resources
Environmental Protection Subcommittee
|
06 Feb 2013 |
2341-v1 |
1 LBNE 2nd NS Site Investigation NEPA-CX Approval January CY2013 |
Michael Weis |
Environmental Protection Subcommittee
NEPA
|
01 Feb 2013 |
1541-v1 |
3 NuMI NEPA-EA FONSI |
Teri Dykhuis |
Environmental Protection Subcommittee
NEPA
|
30 Jan 2013 |
2332-v1 |
1 Hydrostatic Relief Action at NuMI NEPA-CX Approval January CY2013 |
Michael Weis |
Accelerator Division
Environmental Protection Subcommittee
NEPA
|
24 Jan 2013 |
2322-v1 |
20130108 TSS Minutes |
Brian Niesman |
Traffic Safety Subcommittee
|
14 Jan 2013 |
2321-v1 |
20121106 TSS Minutes |
Brian Niesman |
Traffic Safety Subcommittee
|
14 Jan 2013 |
2320-v1 |
20121204 TSS Minutes |
Brian Niesman |
Traffic Safety Subcommittee
|
14 Jan 2013 |
2305-v1 |
1 Muon g-2 NEPA-CX Approval December CY2012 |
Michael Weis |
ESH
Particle Physics Division
Environmental Protection Subcommittee
NEPA
|
02 Jan 2013 |
2279-v1 |
1 Cultural Resources Preservation NEPA-CX Approval November CY2012 |
Michael Weis |
Environmental Protection Subcommittee
NEPA
|
26 Nov 2012 |
2240-v1 |
2 Long Baseline Neutrino Experiment Project Determination September CY2012 |
Michael Weis |
LBNE
Environmental Protection Subcommittee
NEPA
|
14 Oct 2012 |
2190-v1 |
1 Sitewide DWS Replacement Project NEPA-CX Approval September CY2012 |
Michael Weis |
Environmental Protection Subcommittee
NEPA
|
17 Sep 2012 |
2112-v1 |
1 Muon Campus NEPA-CX Approval June CY2012 |
Michael Weis |
Environmental Protection Subcommittee
NEPA
|
19 Jun 2012 |
2051-v1 |
Industrial bridge crane interference with newly installed air handling unit |
Eric McHugh |
Particle Physics Division
Lessons Learned
Subcontractor Safety Subcommittee
Incident Investigation and Analysis
|
03 May 2012 |
2033-v1 |
1 35 Ton LAr Prototype Detector NEPA-CX Approval April CY2012 |
Michael Weis |
ESH
Particle Physics Division
Environmental Protection Subcommittee
NEPA
|
12 Apr 2012 |
1343-v1 |
Recommendation of D&D Certification of NS8 |
Don Cossairt |
Radiation Field Characterization
DOE Waste Management Programs
Facilities Containing Radioactive Matls.
Decontamination and Decommissioning
ESHTRK
Accelerator Division
ESH Tools
Fermilab ES&H Committee - Schedule
Radiation Protection
|
06 Aug 2010 |
1813-v1 |
1 Demolition of Site 12 Barn NEPA-CX Approval Sept. CY2011 |
Michael Weis |
Facility Engineering Services Section
Environmental Protection Subcommittee
NEPA
|
16 Sep 2011 |
1490-v2 |
Electrical Safety Subcommittee NFPA 70E Guidance Documents |
John Anderson |
Electrical Safety
Electrical Safety Subcommittee
|
31 Aug 2011 |
1753-v1 |
1 Phase and Frequency Locked Magnetrons for SRF Sources, Phase II NEPA-CX Approval June CY2011 |
Michael Weis |
Environmental Protection Subcommittee
NEPA
|
07 Jul 2011 |
1725-v1 |
1 Phase and Frequency Locked Magnetrons for SRF Sources NEPA-CX Approval |
Michael Weis |
Environmental Protection Subcommittee
NEPA
|
01 Jun 2011 |
1719-v1 |
SC-FSO NEPA Program Assessment DRAFT Report |
Michael Weis |
DOE Assessments
Environmental Protection Subcommittee
NEPA
|
25 May 2011 |
1717-v1 |
1 T116, T124, T134 Trailer Demolition NEPA-CX Approval May CY2011 |
Michael Weis |
Decontamination and Decommissioning
Accelerator Division
Environmental Protection Subcommittee
NEPA
|
24 May 2011 |
1660-v1 |
NAL NEPA-EIS ROD December CY1971 |
Mark Bollinger |
Environmental Protection Subcommittee
NEPA
|
18 Apr 2011 |
1167-v1 |
1 Industrial Area Site Upgrade NEPA-CX Approval June CY2010 |
Mark Bollinger |
Particle Physics Division
Environmental Protection Subcommittee
NEPA
|
25 Mar 2011 |
1075-v1 |
1 Digital Hadron Calorimeter NEPA-CX Approval April CY2010 |
Mark Bollinger |
Particle Physics Division
Environmental Protection Subcommittee
NEPA
|
17 Mar 2011 |
1138-v1 |
1 MINERvA Test Beam Detector Project NEPA-CX Approval June CY2010 |
Mark Bollinger |
Fermi Site Office
Particle Physics Division
Procedures
Fermilab ES&H Committee
Other
NEPA
|
16 Mar 2011 |
1166-v1 |
1 Illinois Accelerator Research Center NEPA-CX Approval July CY2010 |
Mark Bollinger |
Fermilab
Other
Facility Engineering Services Section
Environmental Protection Subcommittee
NEPA
|
16 Mar 2011 |
1639-v1 |
1 MicroBooNE NEPA-CX Approval March CY2011 |
Mark Bollinger |
Particle Physics Division
Environmental Protection Subcommittee
NEPA
|
16 Mar 2011 |
1542-v1 |
3 NOvA NEPA-EA FONSI |
Teri Dykhuis |
Environmental Protection Subcommittee
NEPA
|
29 Dec 2010 |
1539-v1 |
1 Site Wide Generic Routine Maintenance NEPA-CX Approval March CY2010 |
Mark Bollinger |
Environmental Protection Subcommittee
NEPA
|
23 Dec 2010 |
1224-v1 |
1 NEA NEB NS8 D&D NEPA-CX Approval July CY2010 |
Teri Dykhuis |
Particle Physics Division
Environmental Protection Subcommittee
NEPA
|
10 Aug 2010 |
1223-v1 |
1 D-Zero (D0) Experiment Emergency Generator Fuel Tank NEPA-CX Approval July CY2010 |
Teri Dykhuis |
Particle Physics Division
Environmental Protection Subcommittee
NEPA
|
10 Aug 2010 |
1221-v1 |
1 A1 to CDF Paving Project NEPA-CX Approval July CY2010 |
Teri Dykhuis |
Fermi Site Office
Facility Engineering Services Section
Environmental Protection Subcommittee
NEPA
|
10 Aug 2010 |
1074-v1 |
DOE NEPA Approval for the Digital Hadron Calorimeter |
Teri Dykhuis |
Particle Physics Division
Environmental Protection Subcommittee
NEPA
|
07 Apr 2010 |